(05/02/2020)
The main goal of the project is to increase the volume of rail freight transport and improve the passenger connection of Vukovar-Srijem County by reducing travel time. The section to be modernized is the same on which Agatha Christie places the action of her novel, made into a film, “Murder on the Orient Express”.
The works, which have an execution time of two years, include the reconstruction of the existing Vinkovci-Vukovar track with the electrification of the different sections, as well as the renovation of the Vukovar-Borovo, Nuštar and Bršadin stations including control subsystems, safety signage, railroad crossings solutions, construction of pedestrian walkways and improved accessibility for people with reduced mobility.
|