|
(12/03/2026)
The agreement, signed on 26 January 2026 with Concesión Línea Férrea Central SAS, includes the design and development of the telecommunications, signalling and control subsystems: fibre optics, TETRA radio, Traffic Control Centre, ITCS/PTC, ITS and infrastructure support, with a focus on safety, interoperability and high operational availability. La Dorada – Chiriguaná Railway Corridor is an active section of the national network and is 526 km long. It crosses 25 municipalities in five departments: Caldas, Antioquia, Santander, Norte de Santander and Cesar.
|