(26/09/2023)
The planned network will run through the city centre and, in the first stage, it will begin with four stations at an interval of 90 seconds between cabins. The starting terminal will be at Cantt train station, while other stations will be at Sajan, Rathyatra and Girjaghar (Godowlia) crossings.
The country's first 'urban cable car’ will have the first two stations in operation by 2024 and will be completed by 2025. Its operation will reduce travel times to only 17 minutes between the railway station and Godowlia Chowk, one of the most congested sections.
|